Construction Adhesive
PL 500 Landscape Construction Adhesive on Concrete
Loctite · Construction Adhesive
Portland cement-based cast or pre-cast concrete. Use the calculator below to get a cure-time estimate adjusted for your actual temperature and humidity, then follow the surface-prep checklist.
Full cure (70°F / 50% RH)
168h
Min application temp
0°F
Open / working time
15 min
Clamp / tack time
1440 min
Estimate Cure Time
Surface Prep — Concrete
- 1Concrete must be fully cured (minimum 28 days) before bonding anything to it.
- 2Clean off oil, paint, curing compounds, and efflorescence. Use acid etching or mechanical grinding for smooth slabs.
- 3Concrete is porous — pre-wet slightly for construction adhesives to prevent the concrete from pulling moisture out too quickly.
- 4Cold concrete significantly slows adhesive cure — warm the slab above 50°F (10°C) before applying.
PL 500 Landscape Construction Adhesive on other surfaces
Data sourced from manufacturer's Technical Data Sheet. Last verified: May 2026.
Important: Results are estimates only. Always follow manufacturer instructions. Not suitable for structural, load-bearing, or safety-critical applications.